The project involves upgrading the 46.9 km Van-Muradiye State Road to a 2x2 lane configuration, enhancing the physical standards of the existing road, and replacing the surface with Bituminous Hot Mix.
Key components of the construction work include:
This project will result in a 47 km state road with a 2x2 lane Bituminous Hot Mix surface.