Section 1: Construction of Divaca-Koper Railway Structures

Project Details

 

 

 

The T2 Tunnel boasts an impressive length of 6,017 meters and is notable for its dual-tube design.

The tunnel is being constructed using the New Austrian Tunneling Method (NATM), one of the most modern and effective construction techniques, ensuring high safety and efficiency standards.

LOCATION:
Divača-Koper / Slovenia
×