The design and construction of the S7 motorway section from Czosnów to Kiełpin (9.0 km),
including the creation of 5 viaducts, 4 pedestrian and bicycle bridges, and 2 small animal crossings, the integration of the expanded section into the existing transportation system, as well as possible traffic pattern changes and rearrangements.