The project is carried out by Yörük Yapı İnşaat A.Ş., Ayk Yol Yapı İnşaat Sanayi ve Ticaret A.Ş., Alpan İnşaat Turizm Sanayi ve Ticaret A.Ş., and Kural Yapı Sanayi ve Ticaret A.Ş. The areas where delivery has been made and the required number of residences are as follows:
The duration of the project is 365 days.